Thursday, May 1, 2014

Day 9: Rough In

Day: 9
Schedule: Improved
Prognosis for Survival: Not Bad Today

The window and door have been put in place. They aren't actually set or framed in, but they're in place and are being used to keep the expected rain at bay. There's also been some framing up of things inside. Plumbing work's also been done to move the supply lines away from the exterior wall enough to at least add some foam insulation. They also took out a large section of the old galvanized DWV stack and replaced it with PVC, helping gain an inch or two of space. Have I mentioned that things are pretty tight in the kitchen design?